Specifications include, but are not limited to: -Restoring the roadway embankments, particularly behind and above the four CBC wing walls, and repairing the outfall location above the channel for two type 3 embankment protectors -Restoring the south bank adjacent to and on the CDOT ROW along the creek bed on both sides of I-25 -Extending the inlet and outlet of the CBC to correct the poor upstream and downstream channel alignments -Restore the CBC invert where damage and rebar exposure has occurred -Detour the shared-use-path (SUP) (Sinton Trail) and restoring SUP to original configuration -Restoring the channel area by removing sediment aggradation and debris deposition within the channel area -Place grouted riprap, grouted boulders, riprap and boulders as a best practice to prevent another scour event. -Seeding of disturbed areas.