Specifications include, but are not limited to: 1. Removal of flooring products in all areas (carpet, vinyl flooring) and prep floor to take new flooring products. Flooring will be replaced with (Karndean Opus) LVT in halls, entry ways, restroom, breakroom, closets & high-grade carpet tiles in all office spaces. Include some ½” BC plywood underlayment for entry and closet. 2. Detach, finish & replace existing door slabs, plus add two (2) new complete doors. All door hardware must be changed to Marks (Grade 1 195 Survivor Series) with Best small format 7-pin IC cores. Hinges will be replaced with McKinney 3. Walls & ceilings in all areas must be skim-coated smooth then light hand textured, sealed, primed and painted with two (2) coats of premium (Benjamin Moore) paint color selected by owner. All baseboards and trim must be primed and painted with (2) two coats. 4. Windows in all areas must be sealed, primed and painted on both sides to include the window stool, window apron and frames with (2) two coats. Aluminum blinds for every window must be supplied and installed.