Specifications include, but are not limited to: Furnish all labor, materials, equipment, implements, parts and supplies necessary for window replacement as defined in PW Hall Window Specs (attachment to bid). The work includes replacing approximately 20 windows. Windows are various sizes and configurations (Refer to Drawings). Work done by Asbestos Abatement Company to include: All windows will be removed as facility components and asbestos containing materials shall remain intact with the removed windows. Frames and caulking shall be removed in a manner that does not render the caulking compound friable (i.e. no mechanical means). Removal includes all window components, leaving the rough window opening ready to accept replacement window frames. Temporary framing/OSB sheathing shall be provided to after window removal to ensure building security and weather enclosure. The work includes the replacement of Fifteen (15) transite panels (195 SF). Panels are various sizes and configurations (Refer to Drawings).