Specifications include, but are not limited to: The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Moving Montrose Forward 2024 Street Maintenance Project in accordance with the project plans and specifications. This work includes, but is not limited to, the following key tasks. A. Perform removals as necessary to accommodate new construction including, but not limited to, sidewalks, flatwork, valley pans, curb and gutter, asphalt, and trees. B. Perform waterline replacements to include open-cut trench installations, removal of existing AC pipe where in conflict with improvements, directionally-drilled service replacements, and associated infrastructure. C. Construct new stormwater lines and stormwater replacements to include mainlines, laterals, inlets, catch basins, and manholes. D. Construct new concrete curb and gutter, valley pans, sidewalk, driveways, and curb ramps. E. Perform asphalt patching to include saw cutting or wheel rolling to a neat line, asphalt removal within patch areas, overexcavation and replacement of base soils where required, and asphalt replacement. F. Mill and overlay streets with asphalt pavement and leveling courses in select areas. Milling includes both straight milling and edge taper milling. G. Reconstruct select streets to include removal of asphalt, reconstruction of base course, reestablishment/bluetopping of centerline grade based on existing curb or pre-construction profiles, and repaving with asphalt pavement. H. Implement stormwater management (including preparation of a stormwater management plan and completion of a stormwater construction permit with CDPHE), traffic control (incl. traffic control plan), site security, site restoration, incidental surveying, and quality control testing as required to complete the work in accordance with the plans and specifications.