Specifications include, but are not limited to: 1 Provide and install control software and provide graphics programming of additional equipment, and upgrade existing graphics to display using the new control software on existing front end software and integrate to Library Server with updates as they come out for 5 years. 2 Retrofit the existing mechanical controls in the building for HVAC System (air handling unit, boilers, chiller, Cooling tower, zone induction units and unit heaters). 3 Remove existing Johnson HVAC controls. Leave in place as much reusable controls and wiring. Supply sensors, transducers, pipe wells, transformers, etc., as needed to complete an operable system replacement. 4 Program controllers to meet sequence of operation that utilizes PCCLD equipment to its full capability and reduction of energy usage 5 Provide control drawings or “As-Builts” and project management of all equipment installed. 6 Provide checkout and commissioning of controllers installed. 7 Commission new equipment to the satisfaction of PCCLD. 8 Turn over all administrative level passwords to PCCLD upon project completion. 9 Check existing 24 VAC transformers for suitability for loads and code compliance at power supply cabinets, replace as needed and break out power wiring to even the load by transformer. 10 Use of existing low voltage power wiring is permissible where available and suitable. Check and verify wiring integrity before use, replace as needed. All sensors, transmitters, and actuators to be replaced with new devices. Existing electrical wiring to devices may be reused if suitable, verify wiring integrity before use, replace as needed. Pipe mounted temperature sensor wells may be reused where suitable, replace or install as needed. 11 Install flow switches on boilers 1 and 2 program so boilers cannot start without water flow. Also program controls to recognize and send alarms to control system, verify proper boiler operation. 12 Make controls IT secured BACnet with Smartphone application. 13 Provide laptop with controls and programs. 14 Verify and calibrate all measurable devices for accuracy. 15 Provide 16 hours/year of support and training service for 5 years. 16 Identify energy saving through more efficient operation of PCCLD equipment. 17 Alarm notification via text or email. 18 Notification for freeze stats tripping on air handling units. 19 One year warranty on labor and parts provided by vendor. 20 Reprogram cooling tower operation making sure ice formation does not form on fill media. 21 Program fan terminal units 4 each into the control system.