Specifications include, but are not limited to: A. Perform removals to clear the site for construction including, but not limited to, asphalt pavement, misc. structures, existing piping, valves, and topsoil. Stockpile materials where appropriate for re-use. B. Remove farm fences and salvage to the adjacent landowner. C. Construct temporary construction fencing alongside the project area as necessary to delineate temporary easement areas and maintain functionality of existing fencing. D. Construct approximately 2,700 linear feet of 24-inch PVC waterline to include piping, butterfly valves and vaults, hydrants, tie-ins to existing pipelines, flushing, disinfection, and pressure testing. E. Construct new farm fencing and gates to replace that removed for waterline construction. F. Implement stormwater management (including preparation of a stormwater management plan and completion of a stormwater construction permit with CDPHE), traffic control (incl. traffic control plan), site security, site restoration, final grading, and quality control testing as necessary to complete the work in accordance with the plans and specifications.