Hobart AM16VLT-BASX-2 or equivalent Ventless Dishwashing Machine, tall chamber (27”), door type, energy recovery, high temp sanitizing, 208-240/60/3 (field convertible to single phase), internal condensing system, 40 racks/hour, straight-thru or corner installation, digital controls, Sense-A-Temp™ booster, electric tank heat, X-shaped wash arms, scrap screen and basket, door actuated start, door lock, stainless steel tank, tank shelf, chamber, trim panels, frame & feet, cULus, NSF, ENERGY STAR®. Factory Startup - Free for installations within 100 miles of a Hobart Service Office during normal business hours with appropriate notice; installation beyond 100 miles will be quoted by Service.
Standard warranty - 1-Year parts, labor & travel time during normal working hours within the USA
DWT2-AM16 Drain water tempering (dual valve) kit with Pumped Drain Air Gap for VL-BAS and VLT-BAS models
ACC-INSTALL-HOB Accessory Installation - for installation within 100 miles of a Hobart Service Office during normal business hours with appropriate notice; installation beyond 100 miles will be quoted by Service. Includes installation of this item only, final electrical or plumbing connections by others. Recommendation: coordinate accessory installation with machine assembly/ installation (NET)
DELIVERY
Delivery and install must be completed by June 30th, 2023.
INSTALLATION
Receipt of equipment at local installer’s office and delivery to customer’s facility at a pre‐scheduled time
• Uncrating and set‐in place in existing location on the ground level
• Final hook‐ups (within 5 feet) to existing utilities water, drain, • Installer will make necessary electrical upgrades for new dish machine • Set level and assemble the new equipment in its final location
• Start‐up and operator training to be completed on day of installation to include training on operation, safety, cleaning and light maintenance • Additional 6-months of warranty with the installation of this dish machine. (Total of 18 months)
• Disconnect, removal, and recycle of packaging materials and rubbish
Installations completed during normal business hours. Monday – Friday; 7:00am – 3:00pm
• New equipment must match the location’s current specifications: electrical, gas lines, plumbing/drains, and venting
• Materials and labor to fabricate and install
• Custom Door Type (AM/LT Series)
• Removal & Disposal of old equipment
• Move Tables and Set Back into Place and Plumbing Materials
Not included:
● Any utility or mechanical upgrades, stainless steel modifications or upgrades, or floor, wall, or ceiling/roof modifications
● New shut off valves, pressure regulators, gas hoses, other misc parts
● Permits or tax, if applicable
● Refrigerant recovery fees, if applicable
● More than one trip to the location
● Union or prevailing wage labor
● No vent, stainless steel fabrication / modification, or utility upgrades are included, unless noted in quote.
● No hallway or doorway modifications are included, unless
No hallway or doorway modifications are included, unless noted in quote.
● Other existing kitchen equipment that must be moved (and reinstalled) in order to set new unit in place
● Fabrication Exclusions: Roofing; blocking, nailers and substrates; electrical work; interlocks between the exhaust fans and the make‐up air units; chases and insulation at the grease duct; fire alarm work; duct mounted smoke detectors and the associated electrical power wiring; air balance work; equipment start‐up; temperature controls; crane; structural work; condensate piping; piping & plumbing; cutting & patching of roofs, ceilings, walls and floors; excavation and backfill; painting; warranties/service and repairs to existing HVAC equipment and HVAC equipment furnished by others; design, engineering and drawings for permit; bonds; premium time work; quick ship premiums