Summary of Specifications:
This contract is for basic Engineering, Architectural, and Construction Administration Services as defined in Chapter 1, Types of Consultant Services, of the FAA Advisory Circular entitled “Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects” (AC 150/1500-14D). Durango – La Plata County Airport reserves the right to inquire into the proposer’s ability to provide Incidental and Special Services, as defined in the above mentioned Chapter 1 and paragraph 6a (3) of the same Advisory Circular, and to amend the Schedule of Projects and contract scope of work, at the Durango – La Plata County Airports sole discretion, to include any or all of these above described Incidental or Special Services.
The Schedule of Projects, depending on Federal funding, State funding, and Airport funding may include:
• Terminal Building expansion/or new expansion/construction • Rehabilitate Taxiway “A” • Relocate airfield electrical vault • Expand air carrier apron • Rehabilitate air carrier apron • Runway Rehabilitation (RWY 3/21) • Pavement maintenance for RWY 3/21, taxiway “A” and associated connectors, general aviation apron and air carrier apron • Power Vault Relocation • Acquire ARFF vehicle • Construct De-ice pad • Construct Air Cargo Parking Apron • Construct east development area access taxiway and apron • Relocate VOR/land acquisition for VOR relocation • Acquire Runway 3 runway protection zone (Parcel “R”) • Acquire snow removal equipment (SRE) (carrier vehicles with plows, carrier vehicle with sweeper/broom attachments)
Additionally, the successful consulting firm shall prepare and maintain an electronic database (compatible with AutoCAD) that accurately represents all existing and future civil infrastructure for all projects completed under this contract. The Awarded firm will provide a copy of said database to Durango – La Plata County Airport at its request at any time after award of contract.