Specifications include, but are not limited to: The project objectives include removing approximately 2,500 tons of biosolids that are currently stockpiled in or near the drying beds at the Wastewater Treatment Plant by loading, hauling and disposing of the material to the acceptable site(s). The project objective includes removing approximately 2,500 tons of biosolids that are currently stockpiled in or near the drying beds at the Wastewater Treatment Plant by loading, hauling and disposing of the material to the acceptable site(s). The City of Tracy (City) generates municipal biosolids, a nutrient rich organic material, at the Wastewater Treatment Plant as a by-product of its operation. The City desires to remove and dispose of this material out of San Joaquin annually in accordance with all applicable federal, state and local regulations. The work includes removing the biosolids from the City’s Wastewater Treatment Plant drying beds and stockpiles by loading, hauling and disposing of the existing biosolids. This material should average 90% or greater dry solids at the time of hauling. The work to be performed includes removing approximately 2,500 tons of biosolids that are currently stockpiled in or near the drying beds at the Wastewater Treatment Plant by loading, hauling and disposing of the material to the acceptable site(s). The contractor shall provide certified mobile scales and weigh the trucks before leaving the plant site to determine the tonnage of biosolids hauled, or the contractor may have each truck weighed at a certified scale. The contractor shall conform to all applicable laws, rules, and regulations in performing this work. Care shall be taken not to damage any site improvements at the Wastewater Treatment Plant during the operation. Any damage shall be the Contractor’s responsibility to repair. The biosolids will be in multiple piles. The City shall rank them from first to last the order the piles will be removed.