Specifications include, but are not limited to: Demolition of the existing facility and construction of a new one-story, 7,280 sf wood-framed building which houses CAL FIRE personnel and fire engines. The living quarters of the new fire station has six bedrooms, five bathrooms, kitchen, pantry, storage, laundry room, dining and living room area, office space and radiant hydronic system. The apparatus area of the building has 3 indoor parking stalls for fire engines, storage mezzanine, wheel chair lift, offices, work room, locker room, uniform laundering room, and a public rest room. Project includes a 648 sf CMU generator/storage/boiler building, site demolition, grading and paving, new utilities, automatic fire sprinklers and fire alarm, sanitary sewer, hose wash rack, fire hydrant, yard hydrants, above ground fuel vaults, site fencing, CMU wall, flagpole, communications tower, CMU trash enclosure (164 sf), bicycle rack, site/curb/gutter/sidewalks, site lighting, landscaping, irrigation, storm drainage, and entrance. Fire station is Occupancy Type B/R2, Construction Type V-B. Generator/Storage building is Occupancy Type S2, Construction Type V-B.