Specifications include, but are not limited to: The scope of work for this project generally includes, but is not limited to, furnishing all products, labor, equipment, material, transportation, and incidental services to construct and place into operation the following: 1. New filter valves and actuators ranging in size from 10- inch to 24-inch during a limited period of time per Bid Schedule. 2. Furnish and Install new chemical metering equipment for sodium permanganate and polymer. 3. New utility water pump and caustic mixing centrifugal pumps.4. Modifications to PVC piping and valves for chlorine gas (CLV) and chlorine solution in a limited period of time. 5. Demolition of chemical equipment to be replaced as well as demolition of a Powdered Activated Carbon (PAC) system and liquid chlorine (CL) evaporators, appurtenances and piping.6. One new steel tank for sodium hydroxide storage, five new magnetic level indicators for existing chemical tanks and six new level transmitters. 7. Electrical demolition and reconnection of existing chemical equipment and valve actuators. Installation of push button stations at each valve actuator. Equipment will be future SCADA ready, but not connected to existing SCADA.