Specifications include, but are not limited to: The work to be performed consists, in general, of the construction of new pickle ball and basketball half-courts with walkway access and lighting. All court concrete is to be considered as structural. The work includes, but is not limited to, temporary fencing, construction stormwater compliance, dust compliance, cleaning and grubbing, location of existing utilities and irrigation lines, grading, foundation preparation, drainage facilities, lights with standards and foundations, conduit and conductor, electric service, reinforced concrete courts and concrete walkways, court fencing, court surfacing and striping, pickle ball court net posts with foundations and nets, basketball hoops, basketball backboards and standards with foundations, park benches, electrical installation and testing and project cleanup.