Specifications include, but are not limited to: 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 2 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 100 3 100100 DEVELOP WATER SUPPLY LS LUMP SUM 4 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 5 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 6 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1,280 7 120165 CHANNELIZER (SURFACE MOUNTED) EA 37 8 120204 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY EA 2 9 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 10 129000 TEMPORARY RAILING (TYPE K) LF 660 11 010466 TEMPORARY ALTERNATIVE CRASH CUSHION EA 4 12 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 2 13 130100 JOB SITE MANAGEMENT LS LUMP SUM 14 130200 PREPARE WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 15 130570 TEMPORARY COVER SQYD 220 16 130670 TEMPORARY REINFORCED SILT FENCE LF 400 17 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 1 18 130730 STREET SWEEPING LS LUMP SUM 19 130800 TEMPORARY ACTIVE TREATMENT SYSTEM LS LUMP SUM 20 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM