Mobilization; Traffic Control; Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.; Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression from the NW to the SW As Per The City Modified Standard Drawing #400, and Detail A; Overlay 2’’ Asphalt over the parkway decking and 6 Feet around the corners as highlighted in Detail B; Construct Concrete Sidewalk (Panels and Curb) at the NW and SW corners with maximum slope of 2.0% and to be matched with the existing surrounding levels, without any changes in the elevation, Cast In Place Federal Yellow Truncated Dome, and Rebuilding of a Circular Drain Lid As Per SPPWC 111-5, and Detail B; Mobilization; Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.; Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression As Per The City Modified Standard Drawing #400, and Detail A