Specifications include, but are not limited to:The work necessary for the completion of this contract consists of(1) distributing construction notices to affected businesses and residents; (2) cleaning,inspecting and CCTV recording the storm drain lines; (3) lining of existing CorrugatedMetal Pipe (CMP); (4) potholing and exposing existing storm drain lines and utilities; (5)trench excavating and replacing pipe sections; (6) installing a Polyvinyl Chloride (PVC)storm drain; (7) resurfacing trenches in the roadway and/or parkway, including installing pavement striping and markers; (8) enlarging pipe connections at two existing catch basins; (9) grouting and filling voids within existing CMP; and (10) all other incidental items of work as described in the Contract Documents.” -mobilization and demobilization -traffic control -BMPs -cleaning, exploratory work and preliminary inspection of existing CMP storm drain, including CCTV recordings.