Specifications include, but are not limited to: 1.Gather all construction debris on a regular basis and place it in a dumpster or othercontainer which is emptied or removed on a weekly basis. When appropriate, use tarps on theground to collect fallen debris or splatters that could contribute to stormwater pollution. After breaking old pavement, remove all pieces to avoid contact with rainfall or runoff.2.Remove on-site piles from the site on a regular basis. Only temporary storage is allowed. All temporary soil or other stockpiles on site shall be securely covered with a tarp, plasticsheeting or similar material.3.Remove all dirt/mud, gravel, rubbish, refuse and green waste from the sidewalk,street pavement, and storm drain system adjoining the project site daily and prior to rain. Cleanup leaks, drips and spills immediately. Avoid unnecessary driving on unpaved areas during wetweather.4.Install and maintain stabilized construction entrances to minimize the tracking of dirt, mud, dust and debris onto the public right-of-way.5.Broom-sweep the sidewalk and public street pavement adjoining the project sitedaily and prior to rain. Caked-on mud or dirt shall be scraped from these areas before sweeping.At the completion of work the street shall be washed and the wash water collected and disposed offsite.