Specifications include, but are not limited to: The work necessary for the completion of this contract consists of (1) distributing construction notices to affected residents; (2) construction surveying; (3) pre and post CCTV recording of sewer main and storm drain lines; (4) hydro-cleaning existing sewer main and storm drain lines; (5) constructing sewer point repair and storm drain point repair (6) removing sewer cleanout (lamp hole) and constructing manhole; (7) grinding protruding lateral; (8) lining existing sewer main and existing Corrugated Metal Pipe (CMP); (9) re-opening existing service lateral; (10) plugging or bypassing existing sewers and storm drains as necessary for new work; (11) potholing and exposing existing storm drain lines and utilities; (12) trench excavating and replacing pipe sections; (13) resurfacing trenches in the roadway and/or parkway, including installing pavement striping and markers; (14) grouting and filling voids within existing CMP; (15) installing storm drain inlet riser; (16) all other incidental items to be completed in place.