Specifications include, but are not limited to: The projects consist of the demolition of finishes and old topping slabs; removal of the existing combo walk-in freezer/refrigerator and installation of new walk-in freezer; installation of a new walk-in refrigerator; trenching slab and re-route waste line to floor with the installation of new floor sinks in the kitchen area; installation of new epoxy flooring and cove base, paint application to wall/ceiling finishes and installation of FRP as wall finish in designated areas of the kitchen and storage rooms, adjust and replace stainless steel counter to meet ADA accessibility requirements, removal and replacement of overhead counter coiling door, installation of HVAC exhaust at storage room, plumbing, electrical, and temporary removing and re-installing kitchen equipment and other incidental work.