A. Labor, materials, and equipment necessary for the installation of one (1) new commercial duty vinyl sectional overhead door and roll-up door operator complete with all related hardware and the following benefits: (1) Remove and dispose of existing roll-up door (2) Remove and dispose of existing roll-up door operator (3) Install commercial duty steel roll-up door with a tan finish on exterior and door tracks, door approximately 14'2" x 14'1", final door measurements to be determined by contractor and agreed upon with the CM prior to ordering. (4) Connect new roll-up door to door operator and ensure full operation as designed, existing door has electrical supply, if modifications need to be made to the electrical supply that must be coordinated with the CMD Maintenance personnel and CM/ACM. (5) Galvanized steel aircraft grade cables (6) Precision engineered springs for dependable, long-lasting operation (7) Steelball veering safety rollers (8) Inside slide lock for security (9) Weather-strip on the bottom of the door for proper seal (10) Check/test door in presence of CM/ACM in order to ensure door and operator are properly working (11) Provide CM/ACM with all door manufacturer’s warranty and service paperwork (12) Clean-up work site daily and remove any job related debris