Specifications include, but are not limited to: The project consists of the construction of one sediment control detention basin including paved access road with asphalt concrete and Irrigation/Landscape site improvement. The project basin encompasses approximately less than ½ acres. The project consists of, but not limited to, the following major activates: excavation/embankment fill of soil, placement of riprap, access road, retaining wall, Park and Rec Department access gate, storm drain stand pipe and underground reinforced concrete pipe to drain towards Glenwood Drive through a proposed parkway drain, street improvements of the westerly side of Glenwood drive to include new curb, cross gutter, pedestrian ramps and sidewalk.