Specifications include, but are not limited to: The project consists of constructing a 10-foot wide 4,841-foot linear River Park Trail between a new 0.32 acre staging area at the southern corner of Bridge Road and Bridgevale Road and the recently constructed Apricot Park. A 10-foot wide pedestrian and bicycle trail will pass under the existing San Juan Hollister Bridge and connect to an existing unpaved levee maintenance road for the Industrial Waste Water Treatment Plant (IWTP) where it will connect to the western end of Apricot Lane and the Apricot Lane Park. The trail will be constructed with base rock overlaid with decomposed granite mixed with beeswax. The beeswax will prevent erosion and reduce maintenance costs. An existing six-foot cyclone perimeter fence on the levees will be relocated to prevent pedestrian access to the IWTP and replaced with an eight-foot wrought iron fence.