4.1 FOWD has a network of existing transmission main piping that has been identified for replacement as part of a multi-year capital improvement program. This project encompasses Phase I of the planned transmission main replacement. Design services for the project are scheduled to be completed by January 31, 2025, and construction will follow thereafter. 4.2 Phase I consists of Sections A and B, which each make up a portion of the total alignment for Phase I. This structure will allow FOWD to determine whether both sections can be completed together or if Section B should be deferred to a future project based on the estimated design and construction costs. 4.3 For Section A, approximately 2,180 linear feet of 24-inch ductile iron pipe will be installed to replace the existing 30-inch steel main. Alignment of the new main will begin on Blue Oak Drive at Brome Court and travel northwest to Madison Avenue. It will then continue southwest along Madison Avenue, terminating at Winding Oak Drive. This section includes one connection point to the existing transmission main at Brome Court, which is constructed of newer ductile iron pipe. 4.4 For Section B, approximately 1,200 linear feet of 24-inch ductile iron pipe will be installed to replace the existing 30-inch steel main. Alignment of the new main will begin on Blue Oak Drive at Madison Avenue and travel southwest along Blue Oak Drive, terminating past Great Dome Court. This section includes one connection point to the existing transmission main past Great Dome Court, which is constructed of newer ductile iron pipe. 4.5 All available data including as-builts, map records, and reports will be provided to the selected consultant.