Specifications include, but are not limited to: The work to be done in general but not limited to consist of mobilization; traffic control; water pollution control program; installing of new roadway pavement section; cape seal; coldplan and overlay asphalt roadway; removal and placement of Hot Mix Asphalt (HMA) materials; removal and replacement of concrete sidewalk, curb, gutter, curb ramps and driveways; reconstruction of valley gutters at intersection; lowering and adjustment of utility covers to finish grade; removal and replacement of traffic striping and pavement markings; installing of bike green stripingand markings; relocating roadside signs; and all other work shown on the Plans and as specified in these Special Provisions.