Specifications include, but are not limited to: Furnish and Install all necessary materials, equipment, and labor for Alessandro Pond Optimization Phase 1, including but not limited to all grading and stockpiling, outlet/Inlet protection pad, concrete channel drain; Installation of PVC pipe, pipeline connections, isolation valves, trench excavation plan and sheeting, shoring and bracing, slope preparation and application of 8-inch thick soil stabilizer, preparation and implementation of a Best Management Practices, and implementation of the mitigation measures identified from the Mitigation Monitoring and Reporting Program (MMRP), miscellaneous work all in accordance with the Contract Drawings and Specifications.