1 130300 Storm Water Pollution Prevention Plan LS 2 130550 Temporary Hydroseed 7,358 SY 3 130720 Temporary Construction Roadway 627 SY 4 130710 Temporary Construction Entrance 1 EA 5 131001A BMP Maintenance Cost Sharing 7,500 DLR 6 130640 Temporary Fiber Roll 3,345 LF 7 130680 Temporary Silt Fence 4,021 LF 8 170105 Clearing and Grubbing 4.13 AC 9 170240A Grind Vegetation to 0.5" Maximum in any Dimension 3,332 CY 10 170250A Mix, Spread, and Compact Vegetation Chips with Cover Soils 555 CY 11 180107A Dust Palliatives 30 DAY 12 198020A Onsite Borrow Excavation 3,884 CY 13 198011 Imported Borrow 16,820 TON 14 140904A Airborne Emissions Monitoring 30 DAY 15 141204A Fire Patrol Monitoring and Equipment 30 DAY 16 190060A Staging Area and Decontamination Zone LS 17 190162A Waste Excavation 9,219 CY 18 198115A Mix, Spread, and Compact Waste Material 9,219 CY 19 198110A Mix, Spread, and Compact Fill Material 12,978 CY 20 191209A Energy Dissipator 3 EA 21 191301A Geomembrane 85,750 SF 22 681132 Geocomposite Drain 85,750 SF 23 198151A Geotextile (Demarcation) 9,528 SY 24 200120A Weed Control 196,020 SF 25 210260 Rolled Erosion Control Product (Jute Mesh) 6,000 SF