Specifications include, but are not limited to: All labor, material and equipment required to provide and install (5) 60’x60’ Permanent Modular Buildings at (5) sites (listed below), as indicated in the attached drawings and specifications. Manufacturer shall provide engineered drawings and calculations to the Architect of Record (AOR) for Division of the State Architect (DSA) submittal and approval. Manufacture shall provide any and all support documentation required to the AOR or DSA including but not limited to, supplemental calculations, product data, etc. Manufacturer shall include trips to DSA during scheduled meeting/approvals, as necessary, to obtain DSA approval. Manufacturer shall include all necessary permits and fees (excluding DSA fee), transportation etc., to deliver and assemble Buildings at each site.