Specifications include, but are not limited to: The 2017 Sanitary Sewer Master Plan (https://tinyurl.com/LGSewerMasterPlan) prepared by Dexter Wilson Engineering, Inc. (DWE) identified portion of the District’s sewer system in need of repair and created a short-term (5-year) Capital Improvement Program (CIP) to replace those pipes that were identified. With the assistance of DWE, the District needs to develop plans to replace the sewer pipes outlined in the short-term CIP. This Request for Proposals (RFP) is for the design portion of the 2019/2020 Sewer Replacement and Maintenance Project which contains portions of the District’s sewer system that is of most concern to the District and its staff as the age and location of the pipe is difficult for maintenance and operations and staff to access the pipeline. The project consists of four (4) CIP’s as shown in the Sanitation District’s Sanitary Sewer Master Plan dated August 31, 2017:Condition-based CIP Projects:CIP #3: Central Avenue Pump Station;CIP #10: Arcadia Avenue Replacement Project;Capacity-based CIP Projects:CIP #22: Madera Street Pipeline Replacement;Other CIP Projects:CIP #28: Central Avenue Pump Station Project Additional information about each project can be found in the Sanitary Sewer Master Plan