Specifications include, but are not limited to: The PCC will be a ground-up construction project and will include both on-site and off-site improvements, including redundant utilities, HVAC and electrical systems, and a related telecommunications tower. The Site work will include new utilities (storm, sewer, water, electrical distribution, and lighting) and irrigation systems. The electrical system will include two services to the building. The storm water system shall include storm water quality measures. A new microwave tower and Main Point of Entry (MPOE) will be installed. Parking lots, roadways, and pathways are to be installed for connectivity between SMUD facilities, ADA compliance, and fire department access. Scope includes security systems (cameras, gates, intrusion detection), electric vehicle charging, wireless internet access (Wi-Fi), and physical security measures.