Specifications include, but are not limited to: The Penta Building Group, representing California State University, Long Beach (CSULB) as their Construction Manager, invites trade contractors with and without design/design assist capabilities to prequalify by submitting qualifications for the contract noted below. TASK ORDER CONSTRUCTION AGREEMENT FOR MULTIPLE PROJECTS, TOCA 011. CSU Long Beach Campus 1250 Bellflower Blvd., Long Beach, CA 90840. Deadline for prequalification packages: May 3, 2024. $30 million dollars’ worth of Potential Projects. Parking Structure - Repairs. Repair spalled concrete and cracks. Parking Lot G12 Renovation. Full demolition, earthwork, paving, striping, lighting, signage, hardscape and landscape. LIB Infill Sunken Courtyard for ADA 22-23. Approximately 14,000 s.f. renovation of courtyard, ADA upgrades, hardscape and landscape. FA3 Outdoor Gallery. Refresh of existing space. FA3/FA4 Outdoor Work Yard & Trash Enclosure. Convert and remodel existing space. Main Switch electrical Upgrades. Multiple switchgear replacement. Library 109 Remodel. 20,000 sf of flooring and modification/addition of electrical, ceilings and electrical fixtures. HHW South Loop Laterals. Replacement and upgrades of heating hot water lateral lines. Including restoration of affected hardscape and landscape. MSX Campus-Wide Parking Lot Restoration Summer 2024 (Possible Multiple Projects). Restoration of existing parking lots including but not limited to asphalt replacement, curb & gutter, Landscape & irrigation, slurry seal & striping. (Multiple Projects). Parking Lot E9 Renovation. Complete demolition, earthwork, paving, striping, lighting and landscape. HHW North Loop Laterals...