Specifications include, but are not limited to: The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the contract documents for road rehabilitation improvements along various roads, consisting of the following scope of work: traffic control around the construction zones, grinding existing AC pavement, HMA leveling course, install ARAM, and ARHM overlay. New pavement striping, raising/lowering of utilities, and materials testing will be provided by the CITY. Asphalt and concrete demolition debris shall be recycled or diverted as required by the City’s C&D Ordinance. Traffic Control, Construction Area Signs and Durable Plastic Raised Pavement Temporary Road Markers; Cold Plane AC SY 17,292 ; 3/4” Leveling Course: ½” Hot Mix Asphalt Type A and SS1h Tack Coat TON 4,500; 3/8” Asphalt Rubber Aggregate Membrane (ARAM) SY 115,285; 0.1’ Asphalt Rubber Hot Mix (ARHM) Overlay: ½” Aggregate / Type Gap Graded (GG) TON 600; The work consists generally of: grinding existing AC pavement, placing HMA leveling course, install ARAM, and ARHM overlay. The scope of work includes, prior to the start of construction, the coordination between the City of Imperial and the Contractor. Testing and Studies shall be paid by City.