Specifications include, but are not limited to: The scope of work for this contract includes drilling, construction, development, and testing of two to three new injection wells referred to as IW-1, IW-3 and IW-6. IW-1 shall be located on Coco Palms Drive, approximately 50 feet south of the intersection of Cherrystone Street. IW-3 shall be located at the end of the cul-de-sac on Alipaz Court. IW-6 shall be located approximately 700 feet south of IW-1 on Coco Palms Drive. The wells shall be drilled using the fluid reverse circulation rotary drilling method. The sequence of construction shall be continuous and consecutive, with final development and testing to commence within 10 days of completion of initial development (by airlifting and swabbing).