Specifications include, but are not limited to: The project consists of replacing the existing Oak Ridge Drive over Linda Creek Bridge. Anticipated work consists of the following improvements: 1. Removing the existing two-span reinforced concrete slab bridge over Linda Creek. 2. Construction of a new single span precast/prestressed voided slab bridge over Linda Creek. 3. Temporarily relocating a 6” sewer line and 6” water line 4. Reconstruction of a 6” sewer and a 6” water line. The work includes the following : clearing and grubbing, channel excavation, paving, curb, gutter and sidewalk, retaining wall, grading, bridge construction, abutment construction, slope protection, roadway and sidewalk improvements, utilities including sewer and water, storm drain, striping, and other minor improvements. The work listed above is a partial list of the work that is to be done. It does not include all the work that is required to complete the project. The bridge improvements extend from just south of the intersection of Rampart Drive and Oak Ridge on the south side of Linda Creek to the intersection of Oak Ridge Drive and Vinmar Court on the north sideof Linda Creek.