Project comprises of the restoration of selected areas of the floors, ceilings, beams, columns, rails, curbs for North Pier Parking Structure located at Redondo Beach, California as identified in the Drawings. General building work consists of 2 supported levels and slab-on-grade and includes repair of select areas of the concrete slab, beams, columns, walls, epoxy injection, selected areas of guardrail replacement, traffic markings, etc. at locations within parking structure as shown in Drawings. Seismic work consists of new shear walls supported by micro pile foundations. Cord and drag steel will be added to the existing topping slabs. The existing waffle shear wall on grid line Z between the village and pier level will be strengthened as well as double tee stems in the vicinity. Work on basin level is to be prioritized with work on pier and village level bid as additive bid items. The seismic repairs shall be coordinated and performed concurrently with the general building repairs.