Specifications include, but are not limited to: design of a bridge structure over and across Murrieta Creek connecting Avenida Alvarado at the intersection of Diaz to the west of the creek, with Overland Drive at the intersection of Enterprise Circle to the east of the creek. A separate project, PW16-06 Overland Drive Extension, is currently under construction to extend Overland Drive to Enterprise Circle West. The bridge structure, which is a replacement of a low water crossing of Murrieta Creek at Via Montezuma located approximately ½ miles to the south, is anticipated to be a cast-in-place pre-stressed concrete girder structure spanning approximately 348 linear feet and shall accommodate four (4) 12’ wide travel lanes and two (2) 10’ wide shoulders for a curb to curb width of 68ft. A 5’ wide sidewalk shall also be included on one side. The Proponents scope of services shall also include the bridge abutments, structures, approaches, landscape, irrigation, utility relocations, utility coordination, electrical, signing & striping, water quality, modifications of any existing improvements, lighting, new traffic signals at each of the intersections, and all other services necessary to complete the design, prepare construction documents, obtain necessary permitting/approvals, and right of way acquisition. Project Location is depicted in Exhibit E. The removal of the existing low water crossing is not included in the scope of work.