The scope of work consists of rehabilitation work to modernize interior and exterior building components in one (1) of two units at a duplex building. Unit #280, located at El Pueblo Public Housing Development, 805 El Pueblo Avenue, in Pittsburg, CA. Unit #280 is a two (2)-bedroom unit. The work consist of all walls and ceiling (kitchen and bathroom ceiling shall remain with smooth finish) to receive new "medium orange peel" texture, one (1) coat of prime and two (2) coats of finish paint; new floor covers and base trims; new kitchen cabinets, countertops and accessories; clean-up and polishing of bathroom accessories; new water heater, clean up, maintenance, and repairs as needed of existing wall furnace unit, removal all existing windows and install new retro-fit aluminum frame retro-fit windows, PROFESSIONAL refinishing of existing tubs, cleaning, re-grouting, caulking and polishing of ceramic tile wainscot in a handicapped bathroom, replacing all electrical outlets in the kitchen and handicapped bathroom with GFCI outlets and bringing them to code standards; removal and replacement of electrical light fixtures; new combination smoke alarm and carbon monoxide detectors as per current uniform building code requirements; new plumbing and fixture in a handicapped kitchen, removal and replacement of all damaged interior door and fame with pre-hung interior doors; cleaning, preparing, priming and painting all interior surfaces of Unit #280, soft-wash all exterior surfaces of the duplex building, new insulations on all exposed perimeter walls including the wall between the kitchen and handicapped bathroom, installation of gypsum wall boards on all exposed interior and exterior walls, general cleanup of ground areas and fence surrounding Unit#280 and disposal of debris, prime and paint exterior storage shed, new wood gate, and other miscellaneous work as described in the work specifications (ATTACHMENT - 3).