Specifications include, but are not limited to: Task 1Preliminary Design Services •Provide design development drawings and specifications at 50% and 90% for County review.•Provide Preliminary schedule and budget estimates for all hard and soft project costs.•If required, provide structural engineer for any design and equipment placementTask 2 Structural Load Calculations (if required) Respondent to provide cost for these services.•Structural calculations and serviceswill be provided by design consultant firm and are the sole responsibility of the selected design consultant firm.Task 3 Design Phase Services •Coordinate and implement all design services as required for a complete and biddable project. Including but not limited to drawings and specifications for roofing system alterations, mechanical, plumbing, electrical, DDC controls, carpentry, and general building systems.•Prepare a set of contract documents in order to publicly advertise and let bids for construction of the Project. Contract documents shall consist of bidding specifications, technical specifications, construction drawings, and any testing requirements. Contract documents shall comply with California Public Contract regulations.•Perform Title 24 Energy Calculations•Prepare a final project cost estimate when construction documents are at approximately one hundred percent (100%) prior to public advertisement.•All drawings are to be stamped by the engineer of record.•Attend a minimum of 2 (two) jobsite meetings.