The work to be done is shown on the Plans and described in the Specifications and generally consists of, but is not limited to: Construction and completion of approximately 1,472 LF of 8-inch water main, 188 LF of 4-inch water main, 14 residential services and meters, 4 fire hydrants, 2-inch dead-end blow-off, water sampling station, abandonment of the existing 6-inch water main, 38 LF of 6-inch sewer main, 4 cast-in-place sewer manholes, and 1,403 LF of cast-in-place-pipe (CIPP) sewer pipe lining in a minor arterial City street. Work includes, but is not limited to: soil excavation, rock excavation, backfilling, concrete, pipefitting, pipe abandonment, manhole and drain inlet removal, pressure testing, disinfection, connections to existing City facilities, site restoration, patch paving and trench paving, and traffic control, and all other work required in the Contract drawings.