Specifications include, but are not limited to: 1. Mobilization 1 LS $ $ 2. Traffic Control 1 LS $ $ 3. Sawcut, Remove and Construct PCC Sidewalk 4,861 SF $ $ 4. Sawcut, Remove and Construct PCC Curb and Gutter 5,691 LF $ $ 5. Sawcut, Remove and Construct PCC Cross Gutter 822 SF $ $ 6. Sawcut, Remove and Construct Driveway Approach 3,263 SF $ $ 7. Sawcut, Remove and Construct PCC Curb Ramp 4 EA $ $ 8. Construct PCC Alley Intersection 275 SF $ $ 9. Remove Existing and Construct Parkway Drain 1 EA $ $ 10. Install Curb Infiltration System 2 EA $ $ 11. Cold Mill Existing Pavement (0" to 2.5" deep) and disposal 107,63 9 SF $ $ 12. Remove Existing AC and Base and Construct 6" AC with Leveling Course 120 SF $ $ 13. Construct Pavement – 2.5" Thick (1.5" ARHM Overlay & 1" AC Leveling Course) 1,622 TON $ $ 14. Install Blue Reflective Pavement Marker 6 EA $ $ 15. Replace Existing Water Valve Can & Lid and Adjust to Grade 10 EA