The work to be performed under this contract includes the furnishing of all labor, materials, tools and equipment for the Linda Manor and Old Florin Town Septic to Sewer Conversion (Project) located in the Rio Linda and Florin areas of Sacramento County, CA (location map shown in Drawings). The Project includes construction of the following items: • Construction of approximately 9,485 linear feet of 8-inch Vitrified Clay Pipe (VCP) by open cut. • Construction of approximately 55 linear feet of 21-inch RCP Class III or Vitrified Clay Jacking Pipe (VCP-J) casing by bore and jack. • Construction of approximately 95 linear feet of 16-inch PS-115 ASTM F679 Polyvinyl Chloride (PVC) by open cut construction. • Construction of approximately 13,475 linear feet of 4-inch and 6-inch High Density Polyethylene (HDPE) service laterals by open cut and/or Horizontal Directional Drill (HDD). • Connecting approximately 114 service laterals to existing septic plumbing on private property, abandoning approximately 115 existing septic systems by removing cover, pumping dry, puncturing bottom, and filling void. Disconnect septic plumbing and leach lines and abandon in place. • Sewer bypass system during construction and removal and site restoration following tie-ins. • Removal, replacement, and construction/installation of sewer manholes, and necessary tie-ins, including connection to existing SacSewer Upper Northwest Interceptor (UNWI) manhole. • Pavement restoration.