The City has purchased lighting poles (four), foundations and all associated equipment from Musco Lighting, to be delivered on site. Contractor to complete installation of a fully functional lighting system per the approved plans including all conduit, wiring and components and all setup, testing, adjustment and training as necessary. • The City has purchased a Tesco service pedestal and secured a PGE permit for electrical service from an existing transformer near the district office (existing conduit is in place from transformer area to the field) . Contractor to complete installation of conduit extensions, wiring, pedestal and components necessary to provide power to the Musco control panel as shown on the plans. • Associated restoration and site improvement work to be completed after electrical system install, including a steel perimeter landscape border, decomposed granite and wood chip surfacing, as shown on the plans