Specifications include, but are not limited to: The California Prison Industry Authority (CALPIA) requires groundwork and other construction services to prepare for the erection of a modular building at CALPIA’s Central Office (CO) located in Folsom, California. The Contractor is expected to provide land leveling/grading and excavation services, asphalt paving, and storm drain installation. Refer to the Sample STD 213, Statement of Work and Payment Provisions attached to this IFB as Attachment B for additional details and requirements. CALPIA will work with the Project Manager designated by the Contractor to oversee the entire operation. The Project Manager will serve as the single point of contact for the identification of infrastructure requirements; scheduling, removal, and installation of equipment, and every other aspect to ensure the project is a success. All work shall be performed in accordance with the local codes and regulations. All materials used in this project will be per specifications quoted unless prior approval for substitution is granted by CALPIA. Each interested bidder must attend the mandatory pre-bid conference and simultaneous site visit (walkthrough) at the CALPIA Central Office to gain project clarity (See section B, Item 2 below for additional details). At that time, bidders will have the opportunity to walk the job site to aid in bid completion and the determination of project needs and resources. CALPIA reserves the right, before the conclusion of the contract term to extend the contract for an additional one-year period. A written and approved amendment will be required to extend the contract prior to contract expiration.