Scope of Work: Major components of Project Work consist of upgrades to security and supporting items for the 5th floor South Tower. Replacement of card readers at all doors where they currently exist, and addition of card readers where they do not exist. Replacement of door hardware at all included doors to accommodate the request-to-exit devices in the door handles and electrified strikes. Also included is a CCTV monitoring system, with ceiling and wall mounted camera’s, 55” TV mounted on the wall inside the suite and spot air conditioner for the IT server. The spot air conditioner power is to be connected to emergency power on the 7th floor. Accessibility upgrades: Accessibility upgrades to the building common path of travel have been completed through the access barrier removal program through Department of General Services. The DSA project numbers for the access barrier removal projects are DSA # 001-*11427 and DSA # 03-119496. The following items have been identified as non-compliant with eh 2022 CBC or 2010 ADA standards and correction items are included as part of the project scope: • Signage