3.0 SCOPE OF WORK: Overview: This Renovation Project will include, but is not limited to, any portion of the following: a. Initial planning and site review: Verify existing conditions at the site and all work needed to complete the project. b. Trim all large trees. c. Remove and dispose of all debris. d. Apply weed herbicide as needed. e. Remove all the weeds at the soccer field, grade the field flat and level. f. Plant 250 lbs. of Bermuda seed on the soccer field. g. Install new Goal nets to be 24’ x 8’. h. Install 2 fabric shades over the playground. i. Paint over all graffiti on every structure throughout the park. j. Repair and replace any broken concrete slabs and concrete car stop parking bumpers. k. Perform a thorough inspection of the existing Irrigation system. Replace commercial valves, PVC pipes, sprinkler bodies and nozzles as needed in order to achieve optimal performance of the irrigation system. l. m. Prepare a detailed work plan indicating required and recommended improvements. n. Coordinate design and construction activities with HACR staff. o. Once approved, contractor shall complete the renovation of the Project according within the agreed upon time frame. p. Please see addendum