The project consists of providing traffic control; furnishing and implementing a water pollution control plan; clearing and grubbing; verifying location and depth of existing utilities; performing earthwork and paving; removing/recycling/salvaging demolition and construction waste; adjusting/relocating/removing utility boxes, vaults, manholes, etc.; constructing storm drain improvements; constructing concrete improvements; installing street lighting, traffic signal improvements and fiber optic conduit; performing pavement rehabilitation; installing striping, pavement markings and signing; installing trees, plants, and landscape system; maintaining plants during the plant establishment period; constructing other related work; furnishing and applying dust control measures; keeping a tidy appearance of the job site throughout the project; cleaning site at the end of the job; and furnishing of all labor, materials, tools, equipment, mechanical workmanship, transportation, and services necessary to complete said project.