Specifications include, but are not limited to: Standard walk tread, per specifications, is required. •All metal accessories (caps, walls, scuppers, pockets, etc.) are to be pre-fabricated. In addition, ten (10) sheets of flat stock is to be provided. •Vapor barrier is required. •Provide new expansion/seismic joint cover per plan. •Roof deck is metal decking and slopes via structural framing. There are crickets and tapered insulation at drains. •Calculations signed by a licensed structural engineer confirming the type of fasteners and spacing are required, per Specification 07 54 19, 1.5B, 3b.•New drains are to be provided by vendor and must retro-fit existing conditions per manufacturer specifications. •Roofing manufacturers 80Mil and clad drip edge w/cleat detail is not acceptable in lieu of a coping cap system. •Coping metal is to be 22 GA., GSM, painted. •Coping metal shapes are to be provided in 10’ lengths. Inmate Ward Labor (IWL) will miter and join. •Vendor is to provide GSM cleat metal