Specifications include, but are not limited to: Gym floor preparing and refinishing will be completed at least twice per year (winter and summer) for one 9,363 square foot main gym, one 5,663 square foot small gym, and one 3,745 square foot wrestling room for a total of 18,771 square feet, as requested and scheduled by the CDE contract monitor. For each gym floor, the Contractor will: 1. Prepare each gym floor by dulling and sanding the old finish using #120 grit screen. Dulling and sanding must be completed by using a floor machine with a solution of neutral cleaner and water. 2. Vacuum each gym floor dry, rinse each gym floor with water, and vacuum dry again. Floors must be free of sand, debris, dust, etc. 3. When completely dry, the Contractor will touch up any worn paint as indicated by the CDE contract monitor and apply two (2) coats of Bona Super Sport water based finish. Paint must match the current color.