Specifications include, but are not limited to: Construction of a new control building, including electrical room, mechanical room, workshop, instrumentation and control room, water quality room and restroom; site excavation/temporary shoring, grading, paving, perimeter block wall, and access gates; installation of water lines, sewer line, air lines, duct banks and a new electrical substation; installation of two Metropolitan-furnished pumps, motors, and accessories; installation of five new surge tanks, foundation, anchorage, controls, piping, valving, access manways, ladders, catwalk, and all associated appurtenances; installation of new plug valves, flow metering controls and flow meter for the City of Burbank (B-5) connection; and other appurtenant work.