Specifications include, but are not limited to: Contractor Will Provide All mobilization, fuel, equipment, incidentals and a skilled/knowledgeable operator. Equipment operator is to skillfully and productively separate materials at the City’s Fulton Yard located on Fulton Shipyard Road in Antioch. Material mostly consists of dirt, rock, concrete, asphalt and pieces of pipe from water or sewer repairs. Operator will be directed to sort through existing material and make piles for disposal of the respective material that has been separated or off haul when needed. Additional equipment may be necessary at times and will be paid for as negotiated as needed. A safe and motivated crew capable of performing all work per specifications. After approval to start work the contractor is to supply the City representative with a work schedule that must include starting times, dates and locations.