Specifications include, but are not limited to: Specifically, the project requires the design and installation of: ● Two (2) Express 250 DCFC charging stations ● Two (2) CT4000 ChargePoint Level Two Charging Stations The scope of work includes all work related to the development of plans and specifications for supplying power to the electric vehicle charging stations per PG&E standards and City requirements. The Contractor is also responsible for securing all related permits and coordinating with utility companies and permitting agencies. A building/encroachment permit from the city will need to be obtained but at no cost. In addition, the Contractor will be fully responsible for the electric charging station units once provided to him/her. Any damage to the equipment prior to final approval by both ChargePoint representatives and City staff will be the sole responsibility of the Contractor and no additional compensation shall be provided by City.