The proposed Project will have six major components: (1) installation of a new well located southwest of the territory of the Orosi Public Utility District (OPUD); (2) installation of a new 300,000-gallon storage tank located within the territory of the East Orosi Community Service District (EOCSD); (3) replacement of the old (existing) asbestos-containing concrete-covered distribution pipeline system located in the territory of the EOCSD; (4) connection of a new pipeline from the new well to existing pipelines in Orosi and then connecting a new pipeline to the new storage tank in East Orosi; (5) the replacement of meter boxes within EOCSD, installation of metered service connections and new fire hydrants, and abandonment of both current EOCSD wells; and (6) consolidation of the EOCSD drinking water customers and the Family Education Center into OPUD. The new production well will provide a compliant water supply in an amount sufficient to meet the needs of East Orosi, Culter-Orosi Joint Unified School District (COJUSD) and if desired, to provide a supplemental water source for OPUD and/or Culter Public Utility District.